250 tph
capacity
2024
Silo systems in North Rhine-Westphalia
We recently commissioned two silo plants in North Rhine-Westphalia. From detailed engineering and the supply of the entire process technology to the installation of the entire system: everything from a single source.
A total of more than 400m of conveyor technology was installed at the sites. With a capacity of 250t/h, the output was increased at the same time.
We are pleased that our customers are optimally positioned for the future with the silo system expansion.
Many thanks to all those involved in the project.
In a nutshell
- New construction of silo systems
- Reliable Zuther technology
- Everything from a single source
- More than 400m conveyor line installed
- Capacity increase