Skip to main content Skip to footer content
PDF
29.07.2022

Silo plant: new construction and retrofit

120 t/h
Capacity
2022
New construction of a loading plant for a peeling mill and retrofit of an existing plant

The aim of the project was to optimise the logistics, increase the loading capacity and the buffer capacities.  In addition to the new silos for peas and spelt kernels, which can now be loaded more efficiently with a loading capacity of 120 t/h, the conveyor technology of the existing plant was also modernised and its capacity increased. In order to keep downtimes to a minimum, the entire technology was delivered pre-assembled and installed on site in the shortest possible time.  We are pleased to hand over an optimised plant to the customer through the retrofit of the plant.

In a nutshell
  • Location: Germany
  • New loading facility
  • Retrofit for existing plant
  • Increase in capacity
  • Peel mill
/